1. That the report from Arpita Jambekar, Heritage Planner, Integrated City Planning, to the Brampton Heritage Board Meeting of February 18, 2025, re: Heritage Building Protection Plan, Heritage Conservation Plan and Commemoration Plan for 122-130 Main St N and 7 Church St E – Ward 1, be received;
2. That the Heritage Building Protection Plan, Heritage Conservation Plan and Commemoration Plan for 122-130 Main St N and 7 Church St E prepared by LHC Heritage Planning and Archaeology Inc., dated January 7, 2025 be received;
3. That the following recommendations for the property at 7 Church Street E as per the Heritage Building Protection Plan (HBPP), Heritage Conservation Plan, be followed:
1. That the immediate and long-term protection measures as recommended in Section 5 of the HBPP be implemented for conservation of the property prior to and during the house’s use as a site office;
II. That the property be monitored monthly and City Heritage staff shall be contacted immediately if any changes to the Property that are observed. Additionally, any deviations from the HBPP shall be approved by City Heritage staff prior to implementation;
III. That additional photographs of interior will be added to the HBPP following clean up and prior to any minor modifications required for use of Property as a site office;
IV. That the ongoing and long-term maintenance measures noted in Section 7 and the Interim Construction Protection plan, as noted in Section 8 of the Heritage Conservation Plan be followed to protect the building on the property, before and during the construction of the proposed development;
V. That an architect with relevant conservation experience be retained by the Owner to prepare specific rehabilitation measures for the building’s use as a site office (Phase 2) and residential use (Phase 3);
VI. That a qualified engineer be retained by the Owner to prepare a vibration impact study that considers the impacts of construction of the proposed development on the property at 7 Church St E and that the report be shared with Heritage Staff;
4. That an addendum to the Heritage Conservation Plan be prepared and submitted for review by City Staff prior to issuance of a Building permit for additions and/or alterations, upon finalization of the Phase 2 and Phase 3 rehabilitation measures to the property at 7 Church Street E;
5. That the recommendations of the Commemoration Plan for 122-130 Main St N be followed including:
I. A commemorative/interpretive plaque be installed on the property;
II. Pavers or planters be installed in the approximate location of the gasoline pumps that were formally in front of the existing building on the property; and,
6. That the Commissioner of Planning, Building & Growth Management be authorized to enter into a Heritage Easement Agreement with the Owner for the property at 7 Church St E, to secure the conservation, retention and protection of the property at 7 Church St E, with content satisfactory to the Director of City Planning and Design, and in form approved by the City Solicitor or designate.